Queensland

SUNSHINE COAST UNIVERSITY HOSPITAL

Wagstaff Piling worked closely with other stakeholders on the project to optimise the hospital foundations. A simplistic and standardised piling system...

READ MORE...

Skyring Apartments, Newstead

Diaphragm retaining wall & foundation piles...

READ MORE...

Origin Alliance Ipswich Highway Upgrade

The upgrade of the existing highway required piling works to be completed adjacent to existing motorway...

READ MORE...

Riparian Plaza

Designed supplied and installed an integrated foundation system for a 53 storey building in close proximity to the Brisbane River and a heritage listed drain which was within the building footprint...

READ MORE...

RG Tanna Stockpile

Wagstaff Piling’s early involvement with the client on the design development and construction processes and concepts enabled cost effective foundation solutions to be developed to provide cost and energy saving over the traditional battered bulk excavation...

READ MORE...

SAFE link Alliance - Ipswich and Centenary Highway Upgrade

The project involved the upgrade of Centenary - Ipswich Highway Roundabout and adjacent motorways together with a major existing rail crossing upgrade...

READ MORE...

Gold Coast University Hospital

Wagstaff Piling were engaged by the client by offering an innovative, cost effective solution, by minimising the number of pile caps, which resulted in substantial savings in the overall construction time and cost...

READ MORE...

Legacy Way Tunnel

Construction of bored piled wall retention system for the approach tunnel western portals...

READ MORE...

New South Wales

royal north shore hospital

The provision of a detailed and efficient retaining wall design solution eliminated the requirement for temporary anchors into neighbouring property…

READ MORE...

hillsdale

The economic foundation solution adopted maximised the use of existing in-situ onsite materials for the permanent and temporary works enabling minimal materials being removed to offsite waste facilities...

READ MORE...

hunter expressway

Wagstaff Piling provided a clever innovation by sequencing of vital works and installation of permanent liners. This created a reduction in settlement of existing mine workings and provided less safety hazards by reducing crane lifts...

READ MORE...

Skoda stadium

Wagstaff Piling’s involvement in the early design development and construction concept with the builder presented solutions through our expertise in low headroom and minimal clearance sites and through use of our specialised plant…

READ MORE...

Wet & Wild

Specialised plant enabled Wagstaff to work on complex superstructures requiring difficult access across a very large site. Use of this specialised plant eliminated costs normally associated with larger machinery...

READ MORE...

Western Australia

Victoria

MCG

The bored piles up to 1500mm diameter socketed in the siltstone bedrock were successfully completed within tight budget requirements and 3 construction stages with non negotiable programming constraints...

READ MORE...

Southern Cross Station

Bored piles 28metres depth socketed up to 6metres into bedrock to support the new Southern Cross Station and infrastructure for a proposed future building adjacent to Collins Street...

READ MORE...

Webb Dock

Construction of approximately 200 linear metres of steel sheetpiles for a wharf retention system using 19 metre heavy duty sheetpiles. The retention system was anchored using tie-backs which were secured to a land based sheetpile anchoring system...

READ MORE...

Williams Landing Station

The installation of a bored pile foundation system for a new railway station and platform, together with an overbridge, required day and night shift work, within narrow working corridors immediately adjacent to a major operating electrified rail service between Melbourne and Geelong...

READ MORE...

Cobram Bridge over the Murray River

Wagstaff Piling in conjunction with the main contractor provided an economical and quality foundation solution within strict environmental and programming controls...

READ MORE...


Gold Coast University Hospital

Client:
Lend Lease.

Piling Techniques Utilised:
Over 800 bored piles, 600mm to 1800mm diameter to a depth of 12 metres.

Project Scope:
Design, installation, testing and certification of a bored piled foundation solution for Australia’s largest ever health infrastructure project valued at over $1.5 billion dollars consisting of 7 main buildings on a 20-hectare site.

Project Outcome:
Wagstaff Piling was engaged by the client by offering an innovative, cost effective solution, by minimising the number of pile caps, which resulted in substantial savings in the overall construction time and cost.


Wagstaff prides itself on its team work and innovative staff who work together to solve problems large and small.